Dirty Harry TD(2010) 
37
 Rough cut is done and the target is  screwed in place to make sure it  works and see what adjustments need to be made to the hole.
37
Rough cut is done and the target is screwed in place to make sure it works and see what adjustments need to be made to the hole.
Viewed: 291 times.

38
 Hole is smoothed in and properly shaped.There is some minor chipping to address during the  paint and clear process bu that is to be expected when  cutting a plug out of an already finished playfield.
38
Hole is smoothed in and properly shaped.There is some minor chipping to address during the paint and clear process bu that is to be expected when cutting a plug out of an already finished playfield.
Viewed: 288 times.

39
Target is  refit and checked against the  FT template for the correct sizing and look.
39
Target is refit and checked against the FT template for the correct sizing and look.
Viewed: 295 times.

40
40
Viewed: 280 times.

41
 Glad that is over with.
41
Glad that is over with.
Viewed: 290 times.

42
Hole  looks good.I will prep it and paint the borders next.
42
Hole looks good.I will prep it and paint the borders next.
Viewed: 318 times.

43
43
Viewed: 285 times.

44
44
Viewed: 316 times.

45
 Ready to prep for repaint and clear.
45
Ready to prep for repaint and clear.
Viewed: 294 times.

Powered by Gallery v1 RSS