Medieval Madness Jeff D 
82
 Decals applied.I still need to finish out the edges.
82
Decals applied.I still need to finish out the edges.
Viewed: 204 times.

83
83
Viewed: 251 times.

84
 Playfield rebuild begins.
84
Playfield rebuild begins.
Viewed: 218 times.

85
 Through parts installed lower.
85
Through parts installed lower.
Viewed: 202 times.

86
 Through parts installed mid.
86
Through parts installed mid.
Viewed: 196 times.

87
 Through parts upper.
87
Through parts upper.
Viewed: 213 times.

88
 Far as the top goes without the wiring in place.
88
Far as the top goes without the wiring in place.
Viewed: 191 times.

89
 Underside rebuild begins.Some of the coil assemblies are installed first.
89
Underside rebuild begins.Some of the coil assemblies are installed first.
Viewed: 215 times.

90
 Switch harness roughed in place.It will need a complete rebuild with all new switches.
90
Switch harness roughed in place.It will need a complete rebuild with all new switches.
Viewed: 219 times.

Powered by Gallery v1 RSS