Tales of the Arabian Nights JH 
37
 New cabinet primed and guide-coated
37
New cabinet primed and guide-coated
Viewed: 211 times.

38 
Cabinet is sanded and ready to refinish.
38
Cabinet is sanded and ready to refinish.
Viewed: 187 times.

39
 Cabinet is refinished in the base color.
39
Cabinet is refinished in the base color.
Viewed: 232 times.

40
 Head is prepped to screen.
40
Head is prepped to screen.
Viewed: 202 times.

41
 Warning text screened.
41
Warning text screened.
Viewed: 207 times.

42
 Rebuild  begins.
42
Rebuild begins.
Viewed: 207 times.

43
 Decals applied.
43
Decals applied.
Viewed: 225 times.

44
 Head on lower .Polish brass rails installed.
44
Head on lower .Polish brass rails installed.
Viewed: 256 times.

45
 Cabinet rebuild and wiring is complete less the legs which I will install later.
45
Cabinet rebuild and wiring is complete less the legs which I will install later.
Viewed: 241 times.

Powered by Gallery v1 RSS