Tales of the Arabian Nights JH 
55
 New post are installed.
55
New post are installed.
Viewed: 258 times.

56
 Underside rebuild in process.The rebuilding of the switch harness is just about complete then it will be neatly routed.
56
Underside rebuild in process.The rebuilding of the switch harness is just about complete then it will be neatly routed.
Viewed: 243 times.

57
 All wiring is in place as well as the coils.A little  more finish work and the playfield will be ready to drop into the cabinet.
57
All wiring is in place as well as the coils.A little more finish work and the playfield will be ready to drop into the cabinet.
Viewed: 207 times.

58
 Playfield is ready to  install in cabinet.
58
Playfield is ready to install in cabinet.
Viewed: 223 times.

59
 Playfield installed.
59
Playfield installed.
Viewed: 217 times.

60
 Sword and apron look very nice.
60
Sword and apron look very nice.
Viewed: 225 times.

61
 Powered up for testing.
61
Powered up for testing.
Viewed: 225 times.

62
 Plastics and genie installed.
62
Plastics and genie installed.
Viewed: 255 times.

63
 New left and right ramp are in place.
63
New left and right ramp are in place.
Viewed: 237 times.

Powered by Gallery v1 RSS