Tales of the Arabian Nights JH 
55
 New post are installed.
55
New post are installed.
Viewed: 277 times.

56
 Underside rebuild in process.The rebuilding of the switch harness is just about complete then it will be neatly routed.
56
Underside rebuild in process.The rebuilding of the switch harness is just about complete then it will be neatly routed.
Viewed: 266 times.

57
 All wiring is in place as well as the coils.A little  more finish work and the playfield will be ready to drop into the cabinet.
57
All wiring is in place as well as the coils.A little more finish work and the playfield will be ready to drop into the cabinet.
Viewed: 225 times.

58
 Playfield is ready to  install in cabinet.
58
Playfield is ready to install in cabinet.
Viewed: 244 times.

59
 Playfield installed.
59
Playfield installed.
Viewed: 236 times.

60
 Sword and apron look very nice.
60
Sword and apron look very nice.
Viewed: 248 times.

61
 Powered up for testing.
61
Powered up for testing.
Viewed: 244 times.

62
 Plastics and genie installed.
62
Plastics and genie installed.
Viewed: 272 times.

63
 New left and right ramp are in place.
63
New left and right ramp are in place.
Viewed: 261 times.

Powered by Gallery v1 RSS