Tales of the Arabian Nights JH 
55
 New post are installed.
55
New post are installed.
Viewed: 249 times.

56
 Underside rebuild in process.The rebuilding of the switch harness is just about complete then it will be neatly routed.
56
Underside rebuild in process.The rebuilding of the switch harness is just about complete then it will be neatly routed.
Viewed: 230 times.

57
 All wiring is in place as well as the coils.A little  more finish work and the playfield will be ready to drop into the cabinet.
57
All wiring is in place as well as the coils.A little more finish work and the playfield will be ready to drop into the cabinet.
Viewed: 200 times.

58
 Playfield is ready to  install in cabinet.
58
Playfield is ready to install in cabinet.
Viewed: 215 times.

59
 Playfield installed.
59
Playfield installed.
Viewed: 206 times.

60
 Sword and apron look very nice.
60
Sword and apron look very nice.
Viewed: 219 times.

61
 Powered up for testing.
61
Powered up for testing.
Viewed: 217 times.

62
 Plastics and genie installed.
62
Plastics and genie installed.
Viewed: 242 times.

63
 New left and right ramp are in place.
63
New left and right ramp are in place.
Viewed: 226 times.

Powered by Gallery v1 RSS