Cactus Canyon ML 
47
Head gutted.
47
Head gutted.
Viewed: 148 times.

48
Lower gutted.
48
Lower gutted.
Viewed: 157 times.

49
 This is a close up pre teardown of the underside of the cabinet.Crappy  decal  job and prep  have  made replacement a requirement on this job.
49
This is a close up pre teardown of the underside of the cabinet.Crappy decal job and prep have made replacement a requirement on this job.
Viewed: 143 times.

50
Ready for the dumpster :-)
50
Ready for the dumpster :-)
Viewed: 138 times.

51
 The  coil assemblies will be torn down for polishing and rebuild.
51
The coil assemblies will be torn down for polishing and rebuild.
Viewed: 143 times.

52
 Coil parts are ready for tumbling and polishing.Parts not  fitting that description(plastic parts and boards that go to the coil assemblies) will be cleaned.
52
Coil parts are ready for tumbling and polishing.Parts not fitting that description(plastic parts and boards that go to the coil assemblies) will be cleaned.
Viewed: 148 times.

53
The coil brackets that were  tumbled are ready for final polishing and rebuild.
53
The coil brackets that were tumbled are ready for final polishing and rebuild.
Viewed: 146 times.

54
54
Viewed: 153 times.

55
Flippers rebuilt with   all new parts less the plates.
55
Flippers rebuilt with all new parts less the plates.
Viewed: 161 times.

Powered by Gallery v1 RSS