Cactus Canyon ML 
47
Head gutted.
47
Head gutted.
Viewed: 121 times.

48
Lower gutted.
48
Lower gutted.
Viewed: 130 times.

49
 This is a close up pre teardown of the underside of the cabinet.Crappy  decal  job and prep  have  made replacement a requirement on this job.
49
This is a close up pre teardown of the underside of the cabinet.Crappy decal job and prep have made replacement a requirement on this job.
Viewed: 116 times.

50
Ready for the dumpster :-)
50
Ready for the dumpster :-)
Viewed: 108 times.

51
 The  coil assemblies will be torn down for polishing and rebuild.
51
The coil assemblies will be torn down for polishing and rebuild.
Viewed: 120 times.

52
 Coil parts are ready for tumbling and polishing.Parts not  fitting that description(plastic parts and boards that go to the coil assemblies) will be cleaned.
52
Coil parts are ready for tumbling and polishing.Parts not fitting that description(plastic parts and boards that go to the coil assemblies) will be cleaned.
Viewed: 118 times.

53
The coil brackets that were  tumbled are ready for final polishing and rebuild.
53
The coil brackets that were tumbled are ready for final polishing and rebuild.
Viewed: 116 times.

54
54
Viewed: 113 times.

55
Flippers rebuilt with   all new parts less the plates.
55
Flippers rebuilt with all new parts less the plates.
Viewed: 125 times.

Powered by Gallery v1 RSS