Medieval Madness JP 
19
Topside teardown in process.
19
Topside teardown in process.
Viewed: 248 times.

20
20
Viewed: 204 times.

21
The castle mech is  different as well and looks to have some hand made parts.
21
The castle mech is different as well and looks to have some hand made parts.
Viewed: 193 times.

22
 The gears have a metal plate instead of the production  plastic shims.
22
The gears have a metal plate instead of the production plastic shims.
Viewed: 192 times.

23
 Topside teardown nearly complete.
23
Topside teardown nearly complete.
Viewed: 184 times.

24
Playfield is  removed and stripped complete top and bottom.
24
Playfield is removed and stripped complete top and bottom.
Viewed: 207 times.

25
All parts have been cleaned and rebuilt as  they were removed.The trolls are now being done.New  lighted trolls ,carriages,switches,flaps and locators will be installed.
25
All parts have been cleaned and rebuilt as they were removed.The trolls are now being done.New lighted trolls ,carriages,switches,flaps and locators will be installed.
Viewed: 201 times.

26
New troll assemblies are  built.
26
New troll assemblies are built.
Viewed: 201 times.

27
 Cabinet is ready to complete teardown on.
27
Cabinet is ready to complete teardown on.
Viewed: 224 times.

Powered by Gallery v1 RSS