Medieval Madness JP 
73
Underside rebuild in process.
73
Underside rebuild in process.
Viewed: 227 times.

74
 Stronger troll targets are being installed.
74
Stronger troll targets are being installed.
Viewed: 235 times.

75
New stainless Merlin weldement is used.
75
New stainless Merlin weldement is used.
Viewed: 217 times.

76
 Lamp harness is in place.All  lamps were swapped back to  regular bulbs.
76
Lamp harness is in place.All lamps were swapped back to regular bulbs.
Viewed: 210 times.

77
Decals are finished out.
77
Decals are finished out.
Viewed: 231 times.

78
Edges are done.
78
Edges are done.
Viewed: 204 times.

79
79
Viewed: 209 times.

80
Cabinet is ready to reassemble.
80
Cabinet is ready to reassemble.
Viewed: 240 times.

81
 New rails are installed.The head is back on the lower.
81
New rails are installed.The head is back on the lower.
Viewed: 202 times.

Powered by Gallery v1 RSS