Whitewater KP(2012) 
19
Topside teardown  in process.
19
Topside teardown in process.
Viewed: 198 times.

20
Teardown nearly complete.
20
Teardown nearly complete.
Viewed: 208 times.

21
Playfield is out.
21
Playfield is out.
Viewed: 209 times.

22
Playfield stripped complete.
22
Playfield stripped complete.
Viewed: 211 times.

23
Cabinet  will be  gutted.
23
Cabinet will be gutted.
Viewed: 230 times.

24
Cabinet will be replaced.The  inside  has been repaired and  it is not worth salvaging.
24
Cabinet will be replaced.The inside has been repaired and it is not worth salvaging.
Viewed: 228 times.

25
25
Viewed: 254 times.

26
Head gutted.
26
Head gutted.
Viewed: 223 times.

27
Head is broken and  will be replaced as well.
27
Head is broken and will be replaced as well.
Viewed: 213 times.

Powered by Gallery v1 RSS