White Water JN(2013) 
1
Before teardown takes place  I know that this project will  utilize a new lower cabinet and playfield set so I will get those  ready first.New lower cabinet is prepped for refinishing.
1
Before teardown takes place I know that this project will utilize a new lower cabinet and playfield set so I will get those ready first.New lower cabinet is prepped for refinishing.
Viewed: 459 times.

2
Prime and guidecoated.
2
Prime and guidecoated.
Viewed: 451 times.

3
Sanded based and cleared.Wet  right now.
3
Sanded based and cleared.Wet right now.
Viewed: 446 times.

4
Dried overnight and  ready to  prep for decals at a later stage.
4
Dried overnight and ready to prep for decals at a later stage.
Viewed: 478 times.

5
Replacement playfield  is nice but will need some corrections prior to  being worthy of install.
5
Replacement playfield is nice but will need some corrections prior to being worthy of install.
Viewed: 454 times.

6
First issue is that the clear is too thick and it is  unnaturally gathered in some places like the shooter lane.
6
First issue is that the clear is too thick and it is unnaturally gathered in some places like the shooter lane.
Viewed: 445 times.

7
Other  unnatural gathering areas will be  highlighted by dips and waves in the insert areas.
7
Other unnatural gathering areas will be highlighted by dips and waves in the insert areas.
Viewed: 403 times.

8
Large run present  and highlighted in the light reflections.
8
Large run present and highlighted in the light reflections.
Viewed: 475 times.

9
Another issue to address will be the lack of  white letter bordering for the lite and lock inserts.
9
Another issue to address will be the lack of white letter bordering for the lite and lock inserts.
Viewed: 449 times.

Powered by Gallery v1 RSS