1
Before teardown takes place I know that this project will utilize a new lower cabinet and playfield set so I will get those ready first.New lower cabinet is prepped for refinishing.
Viewed: 508 times.
|
2
Prime and guidecoated.
Viewed: 504 times.
|
3
Sanded based and cleared.Wet right now.
Viewed: 497 times.
|
4
Dried overnight and ready to prep for decals at a later stage.
Viewed: 528 times.
|
5
Replacement playfield is nice but will need some corrections prior to being worthy of install.
Viewed: 506 times.
|
6
First issue is that the clear is too thick and it is unnaturally gathered in some places like the shooter lane.
Viewed: 498 times.
|
7
Other unnatural gathering areas will be highlighted by dips and waves in the insert areas.
Viewed: 451 times.
|
8
Large run present and highlighted in the light reflections.
Viewed: 523 times.
|
9
Another issue to address will be the lack of white letter bordering for the lite and lock inserts.
Viewed: 490 times.
|