Indiana Jones PB 
1
Will prep the NOS playfield first.
1
Will prep the NOS playfield first.
Viewed: 232 times.

2
2
Viewed: 233 times.

3
3
Viewed: 227 times.

4
4
Viewed: 208 times.

5
5
Viewed: 213 times.

6
Mylar sections will need to be removed and the  jet  bumper area needs to be  drilled for the  nails and  bodies.
6
Mylar sections will need to be removed and the jet bumper area needs to be drilled for the nails and bodies.
Viewed: 205 times.

7
Missing  various  holes throught  so the  drilling  process will need to be completed now before clearing.
7
Missing various holes throught so the drilling process will need to be completed now before clearing.
Viewed: 225 times.

8
Sanded and being prepped.
8
Sanded and being prepped.
Viewed: 203 times.

9
there is a  knot in the  wood that  should be  toned down a little.I will address this during the process.
9
there is a knot in the wood that should be toned down a little.I will address this during the process.
Viewed: 255 times.

Powered by Gallery v1 RSS