Attack From Mars TB(2014) 
64
All metal polished.New post installed.
64
All metal polished.New post installed.
Viewed: 201 times.

65
65
Viewed: 223 times.

66
66
Viewed: 171 times.

67
Ready to wire the underside.
67
Ready to wire the underside.
Viewed: 182 times.

68
Underside wiring is in process.
68
Underside wiring is in process.
Viewed: 197 times.

69
Most  generic daisy chains were eliminated in favor of more color correct/durable wiring.
69
Most generic daisy chains were eliminated in favor of more color correct/durable wiring.
Viewed: 162 times.

70
70
Viewed: 195 times.

71
All coils and mechs have been  polished and rebuilt.
71
All coils and mechs have been polished and rebuilt.
Viewed: 161 times.

72
New wrappers or coils if needed.
72
New wrappers or coils if needed.
Viewed: 188 times.

Powered by Gallery v1 RSS