Eight Ball Deluxe SM  
55
New  head is  built.
55
New head is built.
Viewed: 123 times.

56
56
Viewed: 117 times.

57
57
Viewed: 134 times.

58
New  head prepped for  primer.
58
New head prepped for primer.
Viewed: 121 times.

59
59
Viewed: 117 times.

60
New  head primed.
60
New head primed.
Viewed: 145 times.

61
61
Viewed: 125 times.

62
Cabinet is  sanded and ready to  start the painting  process.
62
Cabinet is sanded and ready to start the painting process.
Viewed: 119 times.

63
Lower based in black.
63
Lower based in black.
Viewed: 109 times.

Powered by Gallery v1 RSS