HH and misc MB 
1
HH lower playfield as it  arrived.
Cleaned and  prepped.
1
HH lower playfield as it arrived.
Cleaned and prepped.
Viewed: 261 times.

2
Initial touch ups are done mostly  focusing on the  post locations and  chipping  from the  wire guide removal.Hard to tell which is which so the best interpretation possible is done under the circumstance.
2
Initial touch ups are done mostly focusing on the post locations and chipping from the wire guide removal.Hard to tell which is which so the best interpretation possible is done under the circumstance.
Viewed: 265 times.

3
Jumping forward this has been sanded and cleared once more  some touch ups are further  perfected.
3
Jumping forward this has been sanded and cleared once more some touch ups are further perfected.
Viewed: 269 times.

4
4
Viewed: 247 times.

5
5
Viewed: 270 times.

6
Now  two  years later it is back.It is  sanded  at this time a small  spot of  lint is removed   from the  #2 insert .
The settling of  clear is also  reworked  .Both are normal  occurrences but  an effort is made to  improve them.
6
Now two years later it is back.It is sanded at this time a small spot of lint is removed from the #2 insert .
The settling of clear is also reworked .Both are normal occurrences but an effort is made to improve them.
Viewed: 283 times.

7
Cleared once again.
7
Cleared once again.
Viewed: 301 times.

8
Improved insert area.
8
Improved insert area.
Viewed: 291 times.

9
Upper playfield is a bit on the rough  side but not bad for the  game and era.
9
Upper playfield is a bit on the rough side but not bad for the game and era.
Viewed: 266 times.

Powered by Gallery v1 RSS