Monster Bash Prototype  
100
 Playfield has been sanded.The worn areas will now be addressed.
100
Playfield has been sanded.The worn areas will now be addressed.
Viewed: 198 times.

101
 Small holes are drilled to anchor the repair.
101
Small holes are drilled to anchor the repair.
Viewed: 184 times.

102
 A combo of filler and fiberglass resin are used.
102
A combo of filler and fiberglass resin are used.
Viewed: 165 times.

103
  Repair is roughed in.Will need another application.
103
Repair is roughed in.Will need another application.
Viewed: 185 times.

104
 Small holes drilled again to make sure the next application anchors into the first.
104
Small holes drilled again to make sure the next application anchors into the first.
Viewed: 187 times.

105
 Same combo of materials used but with a different color hardner to show me if I am getting back into the first application.
105
Same combo of materials used but with a different color hardner to show me if I am getting back into the first application.
Viewed: 191 times.

106
 The structural repair is complete.
106
The structural repair is complete.
Viewed: 169 times.

107
 Refinish in process.Starting with the neon/lime green.
 Masked.
107
Refinish in process.Starting with the neon/lime green.
Masked.
Viewed: 179 times.

108
 Green applied.
108
Green applied.
Viewed: 196 times.

Powered by Gallery v1 RSS