Monster Bash Prototype  
28
 With the lamp and solenoid harnesses removed it becomes a little clearer to see what needs to happen with the switch harness.
28
With the lamp and solenoid harnesses removed it becomes a little clearer to see what needs to happen with the switch harness.
Viewed: 245 times.

29
 Switch harness is out and laid out.
29
Switch harness is out and laid out.
Viewed: 228 times.

30
   Switch harness is reworked as far as I can take it until reinstalling it.
30
Switch harness is reworked as far as I can take it until reinstalling it.
Viewed: 216 times.

31
 Most of the underside is removed.
31
Most of the underside is removed.
Viewed: 221 times.

32
 Interesting.Plugs are used for the eddy sensor cut outs.
32
Interesting.Plugs are used for the eddy sensor cut outs.
Viewed: 215 times.

33
 Top side teardown nearly complete.
33
Top side teardown nearly complete.
Viewed: 224 times.

34
 A quick close up of two things.One the color difference in the lagoon area.The other of the cut out for t he once present skip flap ramp.
34
A quick close up of two things.One the color difference in the lagoon area.The other of the cut out for t he once present skip flap ramp.
Viewed: 262 times.

35
 Playfield  is out of the cabinet.
35
Playfield is out of the cabinet.
Viewed: 232 times.

36
 All t nuts removed.
36
All t nuts removed.
Viewed: 235 times.