Monster Bash Prototype  
46
 The coils and assemblies will be cleaned,rebuilt and replaced as needed.There are a few game specific assemblies that are obviously hand fabricated so those will be neated up but not replaced.
46
The coils and assemblies will be cleaned,rebuilt and replaced as needed.There are a few game specific assemblies that are obviously hand fabricated so those will be neated up but not replaced.
Viewed: 247 times.

47
  The mosh pit scoop weldement is a bit different than the typical production one.Hand made and has a little exta reinforcement.I will clean up the rust welds and get the ball chipping burs off while rebuilding it.
47
The mosh pit scoop weldement is a bit different than the typical production one.Hand made and has a little exta reinforcement.I will clean up the rust welds and get the ball chipping burs off while rebuilding it.
Viewed: 223 times.

48
 Coils are cleaned and rebuilt then bagged up.
48
Coils are cleaned and rebuilt then bagged up.
Viewed: 241 times.

49
 Cabinet teardown in process.Even though it will not be decaled it will get completely disassembled and have all parts cleaned,polished refinished etc.
49
Cabinet teardown in process.Even though it will not be decaled it will get completely disassembled and have all parts cleaned,polished refinished etc.
Viewed: 246 times.

50
  Lower is torn down.Siderails removed.
50
Lower is torn down.Siderails removed.
Viewed: 256 times.

51
51
Viewed: 239 times.

52
  This is the area pictured in the begining of the album.I hav removed the loose areas and will rework it so the new rails will have a solid foundation.
52
This is the area pictured in the begining of the album.I hav removed the loose areas and will rework it so the new rails will have a solid foundation.
Viewed: 260 times.

53
    I was able to remove the front decal entirely without damage.The original proto art is in good shape and will not need a lot of attention.
53
I was able to remove the front decal entirely without damage.The original proto art is in good shape and will not need a lot of attention.
Viewed: 280 times.

54
 Begining the repair on the left siderail area.
54
Begining the repair on the left siderail area.
Viewed: 257 times.

Powered by Gallery v1 RSS