Monster Bash Prototype  
64
 Next is the purple.
64
Next is the purple.
Viewed: 217 times.

65
 Blue is now applied.
65
Blue is now applied.
Viewed: 261 times.

66
 A very dark shade of blue is put down next.
This finishes off the leg area.
66
A very dark shade of blue is put down next.
This finishes off the leg area.
Viewed: 231 times.

67
 The rail is placed and all excess overspray is wiped off in that area.I want to concentrate on this area exclusively now that  the legs and foundation have addressed.
67
The rail is placed and all excess overspray is wiped off in that area.I want to concentrate on this area exclusively now that the legs and foundation have addressed.
Viewed: 225 times.

68
 Now that the excess has been wiped off I fade the primary colors back in here with the details(stiches etc) masked off.
68
Now that the excess has been wiped off I fade the primary colors back in here with the details(stiches etc) masked off.
Viewed: 224 times.

69
 I think I have a very nice blend here that will come together once the rail is reinstalled.The area is solid with no cracks now.
69
I think I have a very nice blend here that will come together once the rail is reinstalled.The area is solid with no cracks now.
Viewed: 230 times.

70
 The leg damage came out  better than I could have hopes for.Compared to the siderail damage it was  much easier to address.
70
The leg damage came out better than I could have hopes for.Compared to the siderail damage it was much easier to address.
Viewed: 197 times.

71
 Close up of the worst area of leg wear.It is truly seamless.I doubt anyone would ever  be able to tell.
71
Close up of the worst area of leg wear.It is truly seamless.I doubt anyone would ever be able to tell.
Viewed: 222 times.

72
 Trim out is done.
72
Trim out is done.
Viewed: 236 times.

Powered by Gallery v1 RSS