Monster Bash Prototype  
73
 Back and top refreshed.
73
Back and top refreshed.
Viewed: 232 times.

74
 Floor has a oversprayed pattern on this game so I sanded the floor clean and made the effort to properly recreate it.
74
Floor has a oversprayed pattern on this game so I sanded the floor clean and made the effort to properly recreate it.
Viewed: 236 times.

75
 The work on the lower is done just need to run new ground braid prior to rebuild.
75
The work on the lower is done just need to run new ground braid prior to rebuild.
Viewed: 202 times.

76
 While I let the lower set a little while before rebuild I will freshen the head up.
76
While I let the lower set a little while before rebuild I will freshen the head up.
Viewed: 230 times.

77
 Any major defects or divots in the face and top are filled.
77
Any major defects or divots in the face and top are filled.
Viewed: 240 times.

78
 Ready to refinish.
78
Ready to refinish.
Viewed: 220 times.

79
 Head is refinished and the back is freshened up in the process.
79
Head is refinished and the back is freshened up in the process.
Viewed: 219 times.

80
 Head is ready for rebuild.
80
Head is ready for rebuild.
Viewed: 220 times.

81
 Cabinet rebuild in process.
81
Cabinet rebuild in process.
Viewed: 234 times.

Powered by Gallery v1 RSS