Cactus Canyon VB (2006) 
100
 Have a couple of these ramps laying around as broken up used assemblies so I was able to rebuild another without depopulating the old one.I did have to make new clear plastics for it.
100
Have a couple of these ramps laying around as broken up used assemblies so I was able to rebuild another without depopulating the old one.I did have to make new clear plastics for it.
Viewed: 202 times.

101
 Next ramp to be swapped.This is actually the worst one of the group because it has the plate,two switch holders the flap,the flasher and the stop at the end.Takes a good hour or so to do this ramp.
101
Next ramp to be swapped.This is actually the worst one of the group because it has the plate,two switch holders the flap,the flasher and the stop at the end.Takes a good hour or so to do this ramp.
Viewed: 193 times.

102
 Ramp has been rebuilt.
102
Ramp has been rebuilt.
Viewed: 173 times.

103
 Finally the train ramp.
103
Finally the train ramp.
Viewed: 181 times.

104
Train ramp rebuilt.
104
Train ramp rebuilt.
Viewed: 190 times.

104a
    All the ramps are installed.The wiring was run through clear tubing.All the switches were replaced.The mountain over the mine hole has also been reienforced in it's commonly broken area with clear washers to protect it.
104a
All the ramps are installed.The wiring was run through clear tubing.All the switches were replaced.The mountain over the mine hole has also been reienforced in it's commonly broken area with clear washers to protect it.
Viewed: 208 times.

105
 All done.
105
All done.
Viewed: 226 times.

106
106
Viewed: 234 times.

107
107
Viewed: 273 times.

Powered by Gallery v1 RSS