Login « Register « Sidebar
HEP Restoration Gallery » Past restorations » Addams Family LW(2007)
 
Page: 1 2 3
 

Addams Family LW(2007)

87 items
1
 Starting platform is not too bad for a TAF.Most importantly it is complete.
 
 

1
Starting platform is not too bad for a TAF.Most importantly it is complete.

2
 
 

2

3
 Playfield is okay could be salvaged with some work but considering there is a full playfield Mylar,the cost of repairing it
 
 

3
Playfield is okay could be salvaged with some work but considering there is a full playfield Mylar,the cost of repairing it

4
 
 

4

5
Teardown in process.
 
 

5
Teardown in process.

6
 
 

6

7
 As is typical for a game of this era it is filthy inside.
 
 

7
As is typical for a game of this era it is filthy inside.

8
 Cabinet teardown is in process as well.
 
 

8
Cabinet teardown is in process as well.

9
 
 

9

10
 Playfield teardown is basically complete.
 
 

10
Playfield teardown is basically complete.

11
 The cabinet is gutted as well.
 
 

11
The cabinet is gutted as well.

12
 Cabinet is now ready to be stripped to bare wood,repaired and refinished.
 
 

12
Cabinet is now ready to be stripped to bare wood,repaired and refinished.

13
 Ready to repair.
 
 

13
Ready to repair.

14
 Lower stripped bare.
 
 

14
Lower stripped bare.

15
 
 

15

16
 Head stripped to bare wood.
 
 

16
Head stripped to bare wood.

17
 Cabinet is ready for spray on poly.
 
 

17
Cabinet is ready for spray on poly.

18
 Poly applied.
 
 

18
Poly applied.

19
 Cabinet has been sanded,re sprayed with primer and is now guide coated.
 
 

19
Cabinet has been sanded,re sprayed with primer and is now guide coated.

20
 
 

20

21
 
 

21

22
 Cabinet is sanded and now ready for final prep prior to repainting.
 
 

22
Cabinet is sanded and now ready for final prep prior to repainting.

23
 
 

23

24
 
 

24

25
 
 

25

26
 Cabinet is painted and trimmed out.
 
 

26
Cabinet is painted and trimmed out.

27
 Floor is sanded clean and new ground braid has beem installed.
 
 

27
Floor is sanded clean and new ground braid has beem installed.

28
 Side decals applied.
 
 

28
Side decals applied.

29
 
 

29

30
 
 

30

31
 Front applied and finished.Reassembly under way.
 
 

31
Front applied and finished.Reassembly under way.

32
 All boards repaired,cleaned and installed during head rebuild.
 
 

32
All boards repaired,cleaned and installed during head rebuild.

33
  Decals are finished out.New siderails installed.
 
 

33
Decals are finished out.New siderails installed.

34
 Head is back on lower.
 
 

34
Head is back on lower.

35
Head decals applied and finished out.
 
 

35
Head decals applied and finished out.

36
 
 

36

37
 Playfield is ready to rebuild.
 
 

37
Playfield is ready to rebuild.

38
 Through and hard to get to parts are installed on the topside.
 
 

38
Through and hard to get to parts are installed on the topside.

39
 All new plastic set will be installed.
 
 

39
All new plastic set will be installed.

40
 New stack assembled as an example.
 
 

40
New stack assembled as an example.

 
Page: 1 2 3
 
Advanced Search
Powered by Gallery v2.3