1
Starting platform is not too bad for a TAF.Most importantly it is complete.
|
2
|
3
Playfield is okay could be salvaged with some work but considering there is a full playfield Mylar,the cost of repairing it
|
4
|
5
Teardown in process.
|
6
|
7
As is typical for a game of this era it is filthy inside.
|
8
Cabinet teardown is in process as well.
|
9
|
10
Playfield teardown is basically complete.
|
11
The cabinet is gutted as well.
|
12
Cabinet is now ready to be stripped to bare wood,repaired and refinished.
|
13
Ready to repair.
|
14
Lower stripped bare.
|
15
|
16
Head stripped to bare wood.
|
17
Cabinet is ready for spray on poly.
|
18
Poly applied.
|
19
Cabinet has been sanded,re sprayed with primer and is now guide coated.
|
20
|
21
|
22
Cabinet is sanded and now ready for final prep prior to repainting.
|
23
|
24
|
25
|
26
Cabinet is painted and trimmed out.
|
27
Floor is sanded clean and new ground braid has beem installed.
|
28
Side decals applied.
|
29
|
30
|
31
Front applied and finished.Reassembly under way.
|
32
All boards repaired,cleaned and installed during head rebuild.
|
33
Decals are finished out.New siderails installed.
|
34
Head is back on lower.
|
35
Head decals applied and finished out.
|
36
|
37
Playfield is ready to rebuild.
|
38
Through and hard to get to parts are installed on the topside.
|
39
All new plastic set will be installed.
|
40
New stack assembled as an example.
|