41
Head has been guide coated and sanded.
|
42
Head refinished.
|
43
|
44
Lower is guide coated.
|
45
Lower sanded.
|
46
Lower refinished.
|
47
Warning text has been screened on the head.
|
48
The cabinet is almost ready to ground braid and decal.This game has a VERY heavy oversprayed floor.I will duplicate that as
|
49
The underside of the lower is sanded clean.
|
50
Cabinet is ready to decal.
|
51
|
52
Head is rebuilt.Upgraded speaker system is wired in.
|
53
Decals applied.
|
54
Edges are finished and the decal premask is removed.Head is mounted back on the lower.
|
55
|
56
|
57
Cabinet rebuild complete less the rails and back on legs.
|
58
|
59
|
60
|
61
|
62
Playfield rebuild in process.
|
63
Switch harness rebuilt and installed.
|
64
Lamp harness installed along with most of the coils.Soleniod harness is just set in place at the time of this picture.
|
65
Underside wiring complete.
|
66
Chromed resting brakets installed.
|
67
|
68
|
69
|
70
I will rebuild the drawbridge assembly next.
The drawbridge and the main gear/shaft will be replaced with new.That along
|
71
Drawbridge reassembled.
|
72
clear tubing is used to protect the switch wiring .These often get pinched.
|
73
New moat is being swapped .
|
74
New trolls assemblies with LED eyes.
|
75
Underside complete.
|
76
|
77
|
78
|
79
Troll eyes were wired direct and soldered intothe GI eliminating the alligator clips.
|
80
Playfield is in the cabinet and powered up for testing.
|