Login « Register « Sidebar
HEP Restoration Gallery » Past restorations » Getaway #2 JD
 
Page: 1 2 3
 

Getaway #2 JD

111 items
1
 Average game .Maybe a little below in some spots but not ones that will make a difference for my purposes.
 
 

1
Average game .Maybe a little below in some spots but not ones that will make a difference for my purposes.

2
 
 

2

3
 
 

3

4
 
 

4

5
 
 

5

6
 Probably the worst thing about this game cabinet-wise is that the floor is falling out and it has a large chunk knocked out
 
 

6
Probably the worst thing about this game cabinet-wise is that the floor is falling out and it has a large chunk knocked out

7
 Boards are average.Couple hacks at the GI no big deal.
 
 

7
Boards are average.Couple hacks at the GI no big deal.

8
 Underside is pretty rough but complete.
 
 

8
Underside is pretty rough but complete.

9
 
 

9

10
 Not worried about the rusted brackets.I will have them plated after I bead blast them.
 
 

10
Not worried about the rusted brackets.I will have them plated after I bead blast them.

11
 Typical mild corrosion.
 
 

11
Typical mild corrosion.

12
 Couple of repairs done with electrical tape.
 
 

12
Couple of repairs done with electrical tape.

13
 Floor falling out.
 
 

13
Floor falling out.

14
 Playfield is rough as well.I have a better used one I will be working off of.
 
 

14
Playfield is rough as well.I have a better used one I will be working off of.

15
 Flipper drag wear.Could be fixed but coupled with the many insert issues and my already having a decent one to work off of
 
 

15
Flipper drag wear.Could be fixed but coupled with the many insert issues and my already having a decent one to work off of

16
 
 

16

17
 
 

17

18
 Teardown in process.
 
 

18
Teardown in process.

19
 
 

19

20
 
 

20

21
 
 

21

22
 Topside teardown almost complete.
 
 

22
Topside teardown almost complete.

23
 Underside teardown  in process.
 
 

23
Underside teardown in process.

24
 Most of the underside is  removed.
 
 

24
Most of the underside is removed.

25
 Playfield is out of the cabinet.
 
 

25
Playfield is out of the cabinet.

26
 Playfield stripped complete.
 
 

26
Playfield stripped complete.

27
  Cabinet teardown continues.
 
 

27
Cabinet teardown continues.

28
 All wiring and most parts are out.
 
 

28
All wiring and most parts are out.

29
Head is off the lower.
 
 

29
Head is off the lower.

30
 Cabinet has been gutted and will be replaced.
 
 

30
Cabinet has been gutted and will be replaced.

31
 New cabinet.
 
 

31
New cabinet.

32
 Cabinet will need some perp work prior to refinishing.
 
 

32
Cabinet will need some perp work prior to refinishing.

33
 
 

33

34
 
 

34

35
  Ready to prime.
 
 

35
Ready to prime.

36
Primed.
 
 

36
Primed.

37
 
 

37

38
 Guide coated ready to sand.
 
 

38
Guide coated ready to sand.

39
 Sanding in process.
 
 

39
Sanding in process.

40
 The guide coat helps highlight the grain or imperfections as sanded.
 
 

40
The guide coat helps highlight the grain or imperfections as sanded.

 
Page: 1 2 3
 
Advanced Search
Powered by Gallery v2.3