82
The ball drop on this side needs a little attention.
|
83
The castle lock area is slightly hammered.That is the norm on MM since the ball hits this area in-between the plys instead
|
84
Wood areas that needed repair or clean up are refinished inthe transparent wood tone.
|
85
The starburst are masked and refinished to eliminate the usual insert bordering that you see in them.
|
86
Unmasked.
|
87
Typical moat kickout wear.
|
88
Moat kickout wear has been touched up.
|
89
Playfield is now ready for the first application of clear.I have not repaired everything that needs to be done but I have h
|
90
First application of clear applied.
|
91
|
92
|
93
After a few days cure I will sand it down and start reworking the final details prior to another clear application.
|
94
Playfield is sanded and being prepped for the final repaints and clear.
|
95
I will eliminate the insert bordering in the orange area around the stars.
|
96
Refinished orange.
|
97
Orange unmasked.
|
98
The discoloration in the jet bumper area will be taken care of. I won't refinish the entire top half because it doesn't
|
99
Jet bumper area blended.
|
100
Unmasked.
|
101
The final clear has been applied this is the outcome of the Merlin and jet bumper repair.
|
102
Shoote lane looks good now.
|
103
Wear on the upper loop is taken care of.Had very little as compared to the original playfield in this game.
|
104
Starburst and stars turned out nicely.
|
105
|
106
Playfield is complete will let it set a few days before final sand and buff.
|
107
All coils will be torn down,brackets and hardware tumbled/polished then rebuilt with new coils as needed.
|
108
|
109
|
110
Brackets tumbled/polished.
|
111
Updated trough and Merlin weldement from Mantis are being used.
|
112
Coils are all rebuild.
|
113
|
114
The castle will need to be rebuilt entirely.
|
115
First problem is the coarse screw drove into the gate and plunger.
|
116
The door is beat as well as the hinge.
|
117
Completely broken down.
|
118
A new updated gate assembly from Mantis is being used along with a new door and drive gear with shaft.The original gear an
|
119
All parts are cleaned.
|
120
New switches and gear/shaft assembly installed.
|
121
The wiring to the switches was run through clear protective tubing.This will make them more durable,eliminate the risk of
|