121
The front is closer but not quite there.It has really been a challenge and the main reason the project has drug on.
|
122
The new head is ready to screen.
|
123
Head is screened.
|
124
I just can't get the lower section of the front to look like it should.The problem is it was done with a screen and unlik
|
125
I have saved the rest of the reworks in the front with the exception of the lower.
|
126
Unmasked.
|
127
Since I am decaling the sides and the front anyway I have decided to section in the production lower and couple it with t
|
128
Front is sectioned.It will take a bit of work to seal it up and make it all one.The black shades will be redone entirely.
|
129
This is after it has been worked in several times.Like most cabinet repaints gloss clear is used in the working stages but
|
130
Front is complete in this picture and freshly cleared with the matte clear.The gloss will die off as it dries.
This was
|
131
While the cabinet sets up I will rebuild the playfield which is well cured at this point from waiting on the cabinet.
|
132
Through parts are installed.
|
133
Underside rebuild begins.
|
134
All targets and switches will be replaced.
|
135
This is the pile of trash pulled out of the switch harness.
|
136
Switch harness in place.
|
137
Coils are rebuilt and installed .
|
138
Lamp harness roughed in place.
|
139
Jumping around a little because the cabinet was running a bit behind .Cabinet and new head are decaled.
|
140
The front is a mixture of the best I can do with what was originally there and the later production art from the decal se
|
141
|
142
Rebuild is well underway in an effort to catch the cabinet up with playfield.This game is being picked up in person so it
|
143
Chrome trim will be used.
|
144
the old shifter will be replaced with a new one.
|
145
New shifter is built and wired.
|
146
The power box has been plated and rewired with new components.
|
147
A new 15 foot cord was wired in as well since this game uses the older style box.
|
148
The floor plat was removed and a upgraded speaker was installed.The floor plate removal is done to eliminate the stacking
|
149
Cabinet is wired and up on legs.
|
150
All boards were cleaned and serviced.
|
151
Final harness is roughed in.
|
152
Playfield is ready to go back in the cabinet.
|
153
Playfield is back in the cabinet and powered on for testing.
|
154
Lamp panel was cleaned and rebuilt.
The speaker panel was also cleaned and rebuilt with a NOS panel plastic that was buf
|
155
|
156
|
157
All the insert border reworks turned out well.There look to be no break throughs or light gaps.
|
158
As noted in the previous picture the focus is the insert borders when lit.
|
159
Rubber and plastics are being put in place.
The apron is very nice for this title but there are a couple black spots thr
|
160
|