81
|
82
|
83
Back up on polished legs to match the other chrome parts.
|
84
|
85
Playfield has been polished and is now sanded clean on the underside and ready to T nut.
|
86
T nutted and ready to assemble.
|
87
Through parts installed along with the ball guides.
|
88
|
89
|
90
This is about as far as the topside goes until it gets built underneath.
|
91
Time to install the switch harness.Before I do it will be rebuilt with new targets and switches.
|
92
All new targets to be installed.
|
93
Pile of old targets that were removed.
|
94
Harness rebuilt and ready to install.
|
95
Underside rebuild begins.
|
96
Switch harness is run and the coils that mount switches direct are in place as well.
|
97
|
98
Wiring is complete.Still have the brackets and some large assemblies to install.Some of those assemblies are better instal
|
99
Playfield is about as far as it goes out of the game.
|
100
|
101
|
102
Playfield is in the cabinet.
|
103
|
104
|
105
ALL parts no matter how big,small,or hidden were cleaned and polished.
|
106
|
107
Powered up for testing.
|
108
|
109
|
110
New plastic set is being installed.Cannons are in place but the covers will not be properly installed until everthing else
|
111
|
112
Backboard is decaled and installed along with most of the plastics.
|
113
|
114
As oted earlier the cannon covers are not properly installed at this time just in place and held down so the playfield can
|
115
Jet bumper cap is modified and added for the lower so it will not interfere with the Beta ramp once installed.
|
116
|
117
|
118
New ramps are being prepped.
|
119
Since the new ramps are thicker(good thing)and STTNG has no routed recess I bevel the floors to make them have a smooth t
|
120
New decals and stainless flaps installed.
|