41
Cabinet stripped to bare wood.
|
42
Repairs in process.
|
43
|
44
|
45
Lower repairs almost complete.
|
46
Repairs to the lower complete.Floor is masked,ready to prime.
|
47
Primed.
|
48
Guide coated,ready to sand.
|
49
Sanded ready to refinish lower.
|
50
Lower refinished.
|
51
Head is stripped and repaired.Now ready to prime.
|
52
Head primed.
|
53
After it cures I will sand it and refinish it then rescreen the warning text.
|
54
Prepped.
|
55
Head refinished.
|
56
|
57
Warning text screened on head.
|
58
Cabinet has been prepped and decals are being applied.
|
59
|
60
Decals are in place.
|
61
Edges are finished.
|
62
|
62a
The power box is plated for longevity and a brand new cord(long) is used during the rebuild of the power box.
|
63
Upgraded speaker installed.
|
64
All boards were sent out and serviced.
|
65
Head rebuild in process.
|
66
New siderails are installed and the head is in place.
|
67
Cabinet rebuild is almost complete.
|
68
The coin door used is a nice original from the era that has been properly refinished then completely rebuilt with new slots
|
69
Playfield is sanded and ready for the second and final clear application.
|
70
Clear applied.
While this sets.I will begin the parts restore and reassembly process.
|
71
Playfield has been sanded and polished.
|
72
Underside was sanded as well.
|
73
New T nuts installed.
|
74
All new jet bumper parts.I use black wafers on TAF it matches up much better and is low maintenance long term.
|
75
Playfield rebuild begins.
|
76
Through parts are installed.
|
77
Underside rebuild in process.
|
78
All the targets and switches will be replaced.The targets in the high traffic areas will be the reinforced version that inc
|
79
This is the pile of junk out of the switch harness.All items here were replaced.
|