41
Guide coated.
|
42
Sanded.
|
43
Lower refinished.
|
44
Head sanded.
|
45
Head refinished.
|
46
Warning text screened.
|
47
Cabinet is prepped for decals.
|
48
|
49
|
50
Sides applied.
|
51
Cabinet rebuild is almost complete.Chrome installed as requested.
|
52
Coindoor and launch button.
|
53
Playfield is ready to rebuild.
|
54
|
55
|
56
The correct bevel was cut at the mosh pit hole prior to clearing.
|
57
Playfield is T nutted.
|
58
|
59
Reassembly in process.
|
60
Through parts are installed topside.
|
61
Underside rebuild in process.
|
62
|
63
New reinforced targets will be installed where needed.
|
64
Switch harness is rebuilt and installed.a
|
65
All switches were replaced including the slings.
|
66
|
67
Lamp harness in place.
|
68
Final underside rebuild.Ready to drop back in the cabinet.
|
69
|
70
Back in the cabinet powered up for testing.
|
71
|
72
Plastics and figures are being istalled.
|
73
|
74
Few mores hours and parts and the game will be finished.
|
75
Playfield rebuild is complete.
|
76
|
77
|
78
|
79
|
80
Generic white stand offs were replaced with more appropriate colored ones that were cut to fit.
|