41
|
42
The lower is getting it's final details taken care of.On MM if you upgrade the speaker you have to mount it directly to the
|
43
The pencil line is where it needs to be.It is done with a jigsaw then finished out with a router.
|
44
Floor modification is complete.The cabinet is ready for braiding,partial rebuild and decals.
|
45
The coils are in need of a major overhaul.Many have the wrong parts and hardware.
|
46
The metal parts will be cleaned and polished.
|
47
The coils themselves are mostly beat and will be better off replaced. There are just a couple exceptions.
|
48
The entire drawbridge and gate assembly will be replaced.
|
49
The replacement assembly is in the front.
|
50
The gate is thicker and has the look of rivets on it.Much stronger .
|
51
The drive gear and shaft will be replaced.They often strip.
|
52
The gear cluster will be cleaned and lighly lubricated during the swap.
|
53
Drawbridge assembly is swapped and rebuilt.
|
54
the trolls are wrecked as well.In correct wiring on the left.
|
55
The troll rebuild will include new switches,flaps,locators and the trolls themselves with LED eyes.I will eliminate the all
|
56
Trolls are rebuilt.
|
57
There is now one plau that contains the switch and the LED wiring.This will make it as easy to remove them as they were i
|
58
All the rest of the coil hardware has been cleaned and polished.
|
59
the upper right shows the new stainless moat popper and merlin weldments.
|
60
|
61
Flippers assemblies are entirely new.The old stuff was incorrect and not worth reusing
|
62
All coils are rebuilt.Anything that uses a switch on the assembly has a new one for reliability.
|
63
The ramps will be replaced.The wiring will be tightened up in the process w to give a cleaner look.
|
64
New ramps.
|
65
First ramp to rebuild.New triangle,flap,decal.
|
66
New ramp rebuilt.The wiring that runs up the post to the sockets has been swapped to black and the sockets were refinished
|
67
Other ramp is built in the same way.Lighted dragon installed and he generic stand off is replaced with a cleaner looking re
|
68
New and old moats side by side.
|
69
New moat built.
|
70
New plastic set.
|
71
I will be eliminating all of the generic stand offs(white) and replacing them with a much nice looking purple tube past tha
|
72
Better picture of the swap out.This will be done to all plastics that use the stand offs.
|
73
New and old backboard side by side.
|
74
New backboard swapped and lighted.All connections are made right at the plug to retain the factory ease of removal.This wil
|
75
|
76
Now that all the components are in order the playfields is sanded and buffed.Ready for rebuild.
|
77
First step will be t nutting the underside.
|
78
T nutted.
Before I begin rebuild I will get the cabinet set up.
|
79
Cabinet lower is ready to decal.
|
80
Head rebuild is next.
|