1
Starting out with what looks to be your average FH.
|
2
|
3
|
4
The playfield is a bit beat because there is no Mylar.Not sure if it was removed or never had it at a glance but it doesn't
|
5
Rudy is a mixed bag.
The face and head plastics are in nice shape that and will clean up well.The head mechanically will
|
6
Internals are all there.Dirty but otherwise untouched.
|
7
|
8
teardown in process.
|
9
|
10
|
11
|
12
Playfield is out and nearly stripped complete.
|
13
Cabinet is gutted.
|
14
New playfield.
Needs tp be drilled and dimpled prior to clearing.
|
15
Underside is first.
|
16
Holes located .
|
17
Playfield is dimpled/predrilled underside.
|
18
Top side is next.Notice there are no holes or dimples.I am just using this area as an example.
|
19
Drilling and dimpling in process.
|
20
Top drill and dimple complete.Prep and clear are next.
|
21
Coil assemblies are torn down for polishing and rebuild.
|
22
Coils will be cleaned or replaced as needed.
|
23
Coil hardware ready to rebuild.
|
24
Coils rebuilt.
|
25
Playfield prepped for clear.
|
26
Playfield cleared.
Sanding and final polish will be next.
|
27
New cabinet ready to prep.
|
28
First will be eliminating the grain on the face of the head.
|
29
There are some other spots here and there to be taken care of.
|
30
New cabinet prepped for refinishing.
|
31
Cabinet is primed and guide coated.
|
32
Ready to sand and refinish.
|
33
Head sanded.
|
34
Head refinished.
|
35
Lower refinished.
|
36
After a overnight dry it will be ready to move forward in the process.
|
37
Warning text screened on the head.
|
38
Lower is prepped for decal application.
|
39
Prior to decaling I will install some of the harder to reach parts.Since this is a new cabinet most of the holes are missi
|
40
Reinforced leg plates,sub transformer,ground braid installed.
|