1
Average FH.
|
2
Someone painted the backbox black.
|
3
Apron is nice.
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
Teardown in process.
|
13
Playfield is out of the cabinet.
|
14
Playfield is almost stripped.
|
15
|
16
Playfield is stripped.
|
17
Cabinet gutted.
|
18
Coils are ready to teardown and rebuild.
|
19
All coil parts are polished.
|
20
Coils rebuilt using new sleeves and coils.
|
21
New playfield needs to be prepped for clear and install.First step is drilling and dimpling.
|
22
Underside blank.
|
23
Underside dimpled/pre-drilled.
|
24
Topside drilled and dimpled.
|
25
Jet bumper nail holes were countersunk.
|
26
|
27
Ready to prep for clear.
|
28
Sanded.
|
29
Cleared.
|
30
New cabinet is being prepped for refinishing.
|
31
|
32
|
33
Ready to prime.
|
34
Primed and guide coated.
|
35
Sanded ready to refinish.
|
36
|
37
Cabinet refinished.
|
38
After drying overnight the head will be screened with the warning text.
|
39
Head screened with the warning text.
|
40
Head is rebuilt to a certain level prior to decaling.This being a new head it is a little more challenging locationg all t
|