1
Good starting platform for the most part.
|
2
Front is faded.
|
3
|
4
Hard to tell in the pics but the sides are a bit faded as well.
|
5
Playfield is okay.
|
6
|
7
|
8
A little wear at the bank hole.
|
9
|
10
Left ramp is broken at the mount.I think I have a nice spare that is not damaged.This one can be repaired if not.
|
11
Underside is typical for a SC.Crammed with parts and very tight.Metal condition is average light corrosion in spots nothi
|
12
|
13
|
14
|
15
Teardown in process.
|
16
Topside teardown.
|
17
|
18
|
19
Wrong pop bumper wafers.
|
20
Some wear at the bank hole.
|
21
Playfield is out of the cabinet.
|
22
The remaining post and hardware are removed.It is now bare up top.
|
23
Underside is stripped.
|
24
Cabinet teardown will be next.
|
25
|
26
Cabinet emptied.
|
27
While the cabinet is good and solid it is faded.
|
28
Head faded.
|
29
|
30
Playfield is beeing prepped for clear.
|
31
Shooter lane needs a little work.
|
32
Mylar patches were removed.Needs a little work at the bank hole and some touch up below the lettering.
|
33
Jet bumper area is ground in and will need a bit of repaint.
|
34
Jet bumper wear sanded.
|
35
Refinished.
|
36
Shooter lane and trough exit sanded clean.
|
37
Prepped for clear.
|
38
First clear applied.
|
39
Sanded ready for repaint.
|
40
Bank hole repair.
|