41
This is the correct configuration as shown on another TAFG I am working on.You can see the upper most hole is NOT in the c
|
42
The mis-drilling presents oo big of a problem to overlook.The game is not going to play right this way so I will need to fi
|
43
Incorrect holes are filled and prepped for refinishing.
|
44
I am going to eliminate the blank bar code area as well since I have to do the gray anyway.
|
45
Gray is sprayed.I am just roughing things in at this point since I have not applied the initial clear yet.
|
46
Green is roughed in.Not a perfect match I am sure but should work well given the location and look much better than a bla
|
47
Yellow is roughed in as well.I won't mess with the black bordering until later when I start finishing the playfield out.
|
48
Another problem with the drilling hat was done is that the jet bumper nail holes were not counter sunk.
|
49
There is discoloration and denting from the lack of properly finishing the jet bumper holes.
|
50
Jet bumper holes are properly counter sunk now.
|
51
Ready for th initial clear.
|
52
Shooter lane is looking good.he gray repairs are in order but not yet in the final version.The first attempt is just to ge
|
53
After a few days cure it should be ready for the next and hopefully final repaints and clear.
|
54
Playfield is ready for the next round of rework.This one has been just a little challenging for two reasons.One the mis-d
|
55
Here is the area as it was oughed in to fill the improperly drilled holes.
|
56
I am now working towards properly refinishing the areas I previously roughed in.
|
57
The dark gray was refinished in this area one more time to eliminate the bleed through and the detail work was done in th
|
58
The entire playfield has been recleared but I have used this order to highlight the results of the rework per issue.
|
59
The bar code blank I eliminated will be the other issue to resolve it too was just roughed in during the first pass.
|
60
Final detail work is done to the bar code area and it to is shown after clear.
|
61
The overall playfield as cleared for the second time.
Depending on how these repairs dry down it may be the final clear
|
62
Head is ready to strip and repair.
|
63
Head stripped.
|
64
Ready to repair.
|
65
Seams and gaps are being filled.
|
66
Grain is being eliminated.
|
67
New lower is being prepped.
|
68
Head and lower are ready to prime.
|
69
Primed.
|
70
Guide coated.After an overnight cure they will be sanded and refinished.
|
71
Sanded and ready to refinish.
|
72
Painted and cleared.After an overnight cure it will gloss down to the correct look and be ready to screen.
|
73
Signs of any previous water damage are now gone.Ready to screen.
|
74
Warning text screened.
|
75
Lower art areas are smoothed and the floor is untaped.
|
76
Floor is specially detailed to give a uniform and clean line look.
Ground braid and art will follow.
|
77
Braided with new updated leg plates installed.
|
78
Ready to decal.
|
79
Tags are installed.
|
80
Sides are applied.
|