163
Panel is now installed in the head.
|
164
All the coils ned to be cleaned,polished,rebuilt/replaced.
|
165
The flippers will be replaced entirely.All components from the brackets to the bushings.
|
166
New flippers are assembled.They have the correct plates with the stops made as part of the bracket and the correct flip
|
167
The rest of the coils will be torn down.
|
168
|
169
All metal will be tumbled or polished.
|
171
Parts have been tumbled polished and cleaned.
|
172
Drop target assemblies were rebuilt,new decals were installed.Each switch was polished and the dasiy chains removed.Durin
|
173
The resto of the coils are rebuilt as well.I was able to save most of the original coils or wrappers to use on new ones as
|
174
|
175
While the coil hardware tumbles I have polished the lower playfield out.
|
176
I will run new braid and stapled sockets.
|
177
Upper t nutted and ready for assembly.
|
178
T nutted and braided.Ready to reassemble.
|
179
Upper has been polished.
|
180
The rails and bumper are installed on the upper.
|
181
The lower needs to go in the cabinet first so it will be the first assembled.
|
182
|
183
|
184
This is about as far as the top goes until it is wired.
|
185
Underside rebuild begins.The trough switches were updated since they were previously changed out with incorrect hardware
|
186
Switch harness is ready to install.
|
187
I will be eliminating all the generic daisy chains in the switch and lamp harness.That means that the plain and typically
|
188
As with the trough switches the ball kickout switch has been rigged and the original hardware is gone.Not a big deal but
|
189
Here is the correct style switch that has been modified to work in it's place.
|
190
Each target bank will be fitted with a single connector to make it much easier to service if needed in the future.The plug
|
191
|
192
Plug installed.The coil wires are part of the plug as well coming off the bank and will be added to the rest of the harnes
|
193
Switch harness rebuild and install is complete.
|
194
Lamp harness has now been installed along with the coil assemblies.
|
195
The fuse holders were replaced with a smaller /cleaner style.
|
196
Coil harness will be next then the lower should be just about ready to drop into the cabinet.
|
197
Coil harness has been soldered into place.All wiring has been neatly routed and tied in.
|
198
|
199
|
200
Underside rebuild of the lower is complete and it is ready to drop into the cabinet.
Upper rebuild will be next.
|
201
Upper playfield rebuild in process.
|
202
Underside rebuild begins.
|
203
Like some of the switches on the lower playfield the upper has a incorrect switch set up in the trough.
|