200
NOS plastic set to be installed.
|
201
|
202
New ramp is built and in place.The top portion is done.
|
203
A little more assembly is left on the lower.
|
204
|
205
The wire forms are refinished and cleared.
|
206
Nice slick finish.
Once cured I will install them.
|
207All plastics are now in place.
|
208
Wireforms are installed.
|
209
Playfield is complete less the apron which will be cleared to freshen it up as much as possible as well as protect it.
|
210
Apron and glass are installed.
|
211
Game is now complete.
|