121
|
122
Inside decals that were supplied are installed.
|
123
The edges will be finished out next and the rebuild will continue.
|
124
Edges are finished and rebuild begins.
|
125
Coin door was restored back to the correct original finish and new acceptors were installed.
|
126
Chrome rails installed as requested.Head is back on lower.
|
127
|
128
Correct screening on head,new tags.
|
129
|
130
Coin door installed.A modified start buton is installed to better match the cabinet.
|
131
Wiring neatly in place.
|
132
|
133
|
134
|
135
Restoring the ramps will be next.They are not broken so replacement was not necessary.
|
136
Ramp stripped down.
|
137
Bleached and flame torched.
|
138
New decals,clear triangles and flaps will be installed.
|
139
Left ramp torndown.
|
140
New spotlights will be installed.
|
141
Ramp is clean and polished now reassembled.
|
142
New decal,triangle and flap.Switches and screws were replaced as well because.There was just too much rust on the screws t
|
143
Left ramp restore complete.
|
144
Right ramp complete.
|
145
Playfield is ready to preep for rebuild.
|
146
Sanded clean and buffed.
|
147
Polished T nuts installed.
|
148
Ready to rebuild.
|
149
Through parts installed.
|
150
|
151
|
152
Ready to flip.
|
153
|
154
Underside rebuild begins.
|
155
New reinforced targets will be used in the troll location.
New sling switches and roll overs will also be installed.
|
156
Switch harness rebuilt and in place.
|
157
Lamps are next. Feature lamps are being swapped out for LEDs as requested.
|
158
Lamp boards are now in place.
|
159
Castle rebuild is next.
|
160
Castle torn down.
|