161
Gears will be cleaned,a new main gear and shaft will be installed
|
162
Rebuilt with new drawbridge gear and shaft.Properly greased for quiet operation.
|
163
Ready to install.
|
164
Modified back panel.
|
165
Wired into the factory connector for asy removal if needed later.
|
166
Damsel mod installed as requested.
|
167
DMD panel rebuild begins.
|
168
Torn down and thoroughly cleaned and refinished as needed.
New window is being installed.
|
169
Rebuilt with new speaker set.
|
170
Underside wiring complete until install.
|
171
Chromed resting brackets replace the corroded ones.
|
172
Playfield is back in the cabinet.
|
173
Powered up for testing.
|
174
after some tweaking all leds are burning .
|
175
|
176
|
177
Final assembly will continue.Maybe a day of rebuild left.
|
178
Rebuild is complete less the translite.
|
179
Castle detailed.Modified dragon installed.
|
180
|
181
New socket and wiring to replace the previously painted one.
|
182
|
183
Wireforms plated not painted :-)
|
184
|