161
Playfield is set back in the cab briefly for test fitting.I need to make sure everything is level etc before populatin
|
162
I have been waiting to tackle the back glasses and housing until I had everything else in place because the frame was do
|
163
Glasses removed.
|
164
Inner and outer frames are separated.
|
165
Outer frame must be done in the same manner and finish as the cabinet so it is stripped and being straightened.
|
166
Repairs to the outer frame are complete.
|
167
Outer frame primed and guide coated.
|
168
Outer frame sanded and ready for refinishing.
|
169
Outer frame painted and cleared.Same clear formula as the cabinet so it will die down as it cures.
|
170
Outer frame is dry and ready to rebuild.
|
171
Inner frame was refinished in a base black to freshen it up although it is not really seen.Will be rebuilt with new bulb
|
172
Frame is being rebuilt.Inner glass has been cleaned and installed.
|
173
About ready to mount onto the head.
|
174
Rebuilt lamp panel installed.
|
175
Frame installed.
|
176
Outer glass is cleaned and the lower channel is polished up.
|
177
Outer glass installed.
|
178
All of the smaller pin connectors have been rebuilt and the larger ones as well where needed.
|
179
Cabinet wiring is complete.
|
180
|
181
|
182
New speaker was installed.
|
183
Cabinet is done and waiting on the playfield.
|
184
Cabinet powered up to verify we are in good shape moving forward.
|
185
Cabinet and displays check out. Onto finishing up the playfield rebuild.
|
186
Playfield rebuild continues.
|
187
All new jet and dead bumper parts.
|
188
Hard to tell in the picture but Mylar rings are installed around the pops.I don't usually use them but on the older games
|
189
New post installed.
|
190
Ready to start the underside.
|
191
New lamp sockets are being installed .There are a lot of them so this will be time consuming but I can't see reusing a bun
|
192
Braid is run and soldered in.
|
193
All targets will be replaced and the correct diodes and caps will be installed .
|
194
Example of replaced/properly rebuilt target.I will also add the caps to the jet bumper switches.
|
195
The spoons on all 7 pop bumper style switches will be replaced.
|
196
Just a bit of the upper portion is in place but the wiring is taking shape.It takes quite a while to go through it all to
|
197
Making a little more process.Doesn't look like much but this is quite a few hours in the making.
|
198
I have many of the new sockets soldered in with many more to go.
|
199
I will replace the flimsy hanger brackets with a modified newer version that is much stronger.This should help reinfor
|
200
The new hanger brackets are modified and installed.They obviously had to be shortened,shaped and drilled but they also h
|