1 Pretty nice starting platform over all.It has the most important things covered.
2
3
4
5 Th lockbar supplied is incorrect but that isn't a big deal since we will be needing the correct rails and legs as well anyw
6 Teardown begins.
7
8 Missing a speaker.Not a big deal but this is how it came in.
9Dot controller is a replacement.Should be fine but again worth noting.
10
11 Head gutted.
12 Underside is average in terms of neatness(lack of) and dirt.
13
14 Most of the underside is removed.
15 Working on the topside now.
16
17 Playfield is stripped bare and out of the cabinet.
18 Cabinet teardown is next.The cabinet is okay but has possibly seen some moisture.
19 Ready to begin the playfield restoration.
20 Mylar sections removed and the playfield is sanded.
21 Shooter lane sanded as clean as possible.
22 The chair hole will need just a little work.Very little.
23 Ready to clear.
24 Sprayed with adhesion promoter.
25 Cleared.
26 Shooter lane as cleared.
27
28
29 After it cures a couple days it will be ready to sand and clear for a final time.
30 Playfield is cured and has been sanded.
31 Some minor repaints are being done to eliminate the insert bordering in the yellow.
32 Cleared for a second time.
33
34 Yellow repaints as cleared.
35
36 Other yellow repaints as cleared.
37 Depending on how this settles in it will be ready to either sand and polish or sand and final clear in a few days.
38 New lower is being prepped.
39 Lower primed and guide coated.
40