Login « Register « Sidebar
HEP Restoration Gallery » Past restorations » Attack From Mars KP(2010)
 
Page: 1 2 3
 

Attack From Mars KP(2010)

104 items
1
 AFM starting platform.
 
 

1
AFM starting platform.

2
 Faded which is typical.
 
 

2
Faded which is typical.

3
 
 

3

4
Other side is not  quite as faded but more on the front than the back end.
 
 

4
Other side is not quite as faded but more on the front than the back end.

5
 Teardown begins.
 
 

5
Teardown begins.

6
Head gutted.
 
 

6
Head gutted.

7
Underside teardown begins.
 
 

7
Underside teardown begins.

8
There are some wiring issues here and there all minor but this is just a sample of them.
 
 

8
There are some wiring issues here and there all minor but this is just a sample of them.

9
 Wiring  and most mechs removed.
 
 

9
Wiring and most mechs removed.

10
Topside teardown  nearly complete.
 
 

10
Topside teardown nearly complete.

11
 Playfield is out of the cabinet.Topside stripped complete.
 
 

11
Playfield is out of the cabinet.Topside stripped complete.

12
 Underside stripped complete.
 
 

12
Underside stripped complete.

13
 Cabinet is being gutted.
 
 

13
Cabinet is being gutted.

14
 Head will be restored and reused.
 
 

14
Head will be restored and reused.

15
 Lower will be replaced.
 
 

15
Lower will be replaced.

16
 New lower and  used head are ready to  begin prep.
 
 

16
New lower and used head are ready to begin prep.

17
 Replacement playfield will be reworked prior to  install.
 
 

17
Replacement playfield will be reworked prior to install.

18
 The main issues will be  highlighted in the following pics.
Mostly  what needs to be taken care of are  clear and insert s
 
 

18
The main issues will be highlighted in the following pics.
Mostly what needs to be taken care of are clear and insert s

19
 There are some minor specs of trash present.Nothing  alarming but  worth noting  in the picture.
 
 

19
There are some minor specs of trash present.Nothing alarming but worth noting in the picture.

20
 Graining.
 
 

20
Graining.

21
 A bit puddled.
 
 

21
A bit puddled.

22
 Sanded and  ready to clear.
 
 

22
Sanded and ready to clear.

23
Cleared.
 
 

23
Cleared.

24
 Wet in these pics but  that should be  what it needs in terms of clear application
 
 

24
Wet in these pics but that should be what it needs in terms of clear application

25
 After it sets a few days  it will be ready to sand and polish.
 
 

25
After it sets a few days it will be ready to sand and polish.

26
 Moving onto the ramps.They  will be new.
 
 

26
Moving onto the ramps.They will be new.

27
Flaps were removed so  I can install  the Pinbits stainless version.
 
 

27
Flaps were removed so I can install the Pinbits stainless version.

28
 New ramps are built.
 
 

28
New ramps are built.

29
 Head is stripped and repaired.
 
 

29
Head is stripped and repaired.

30
 New lower is guide coated to help get it  straight prior to priming.
 
 

30
New lower is guide coated to help get it straight prior to priming.

31
 Sanded and ready to prime.
 
 

31
Sanded and ready to prime.

32
Primed and guide coated.
 
 

32
Primed and guide coated.

33
 Sanded and ready to refinish.
 
 

33
Sanded and ready to refinish.

34
Sealed and paintd.
 
 

34
Sealed and paintd.

35
Head cleared.
 
 

35
Head cleared.

36
Lower cleared.Gloss will  flatten outto the correct level as it cures.
 
 

36
Lower cleared.Gloss will flatten outto the correct level as it cures.

37
Head screened with the warning text.
 
 

37
Head screened with the warning text.

38
Ready for decals and rebuild.
 
 

38
Ready for decals and rebuild.

39
Playfield is sanded and polished.Ready for rebuild.
 
 

39
Playfield is sanded and polished.Ready for rebuild.

40
 cabinet is decaled.
 
 

40
cabinet is decaled.

 
Page: 1 2 3
 
Advanced Search
Powered by Gallery v2.3