202
Braid is run.
|
203
|
204
Head is being rebuilt.
|
205
Head is built.Boards were serviced as needed.
|
206
Rails cannot be replaced so these were regrained and installed.
|
207
Head is back on lower.
|
208
Will wire the cabinet next.
|
209
Cabinet rebuild is complete.
|
210
All interior parts were plated as needed.
|
211
Wiring is neatly routed and loomed.
|
212
|
213
Up on legs.I could use the correct System 11 legs but I do not like the tight crimp on those it digs into the cabinet a
|
214
|
215
Playfield is sanded and ready to polish.
|
216
Playfield is polished.
|
217
|
218
|
219
|
220
Underside sanded clean ready to t nut.
|
221
T nuts installed.
|
222
New sockets and braid are run.
|
223
Playfield is ready to begin rebuild.
|
224
Finishing up the upper playfield.I will repaint the colored sections.
|
225
|
226
|
227
|
228
Upper cleared once again.
|
229
Back to rebuilding the lower.
|
230
Through parts installed.
|
231
|
232
|
233
Ready to flip.
|
234
Underside is ready for rebuild.
|
235
Switch harness rebuilt and installed.
|
236
Lamp boards and harness are in now.All that is left is the solenoid harness.
|
237
Playfield is wired and now back in the cabinet.
|
238
Lamp panel was refinished and rebuilt.The speaker panel will be rebuilt later with a new display but for the time being it
|
239
|
240
|
241
|