81
Floor was sanded clean and masked and the lower repairs are in process.
|
82
Ready to prime lower.
|
83
Head repaired and ready to prime.
|
84
Head primed.
|
85
Lower primed.
|
86
After a day or two lower will be ready for refinishing.
|
87
Moving back to the final details of the playfield.
|
88
Sanded.
|
89
Ready for final clear.
|
90
Final clear applied.
|
91
Cabinet sanded and being prepped for final paint.
|
92
Ready for final paint.
|
93
Cabinet is sealed in dark shade.
|
94
Based in black.
|
95
Cleared.Will die down as it cures.
|
96
|
97
|
98
|
99
|
100
Decals applied.
|
101
|
102
Playfield is polished and ready for rebuild.
|
103
|
104
|
105
|
106
Mine hole repair.
|
107
Drop target area.
|
108
Shooter lane and ball drops.
|
109
Cabinet rebuild is complete.
|
110
|
111
|
112
New coin door.
|
113
|
114
Playfield rebuild in process.
|
115
Mine hole turn out very nice will likely go with the Mantis protector.
|
116
Drop target area looks great as well so I will avoid using the Cliffys on there.
|
117
|
118
|
119
Just about ready to flip.
|
120
Rebuild of bart is next.
|