41
Topside will now have the Mylar sections removed and will be cleaned.
|
42
Mylar removed.Playfield is cleaned.
|
43
|
44
|
45
Playfield is ready to move into the refinishing process.
|
46
Head is removed and will be replaced.
|
47
Lower is gutted and will be replaced as well.The cabinet is split at two seams and is not very structurally sound.
|
48
Pretty much every board that came out of the game has been hacked but I had already pulled and sent the driver,and dot c
|
49
Sound board problems.
|
50
CPU problems.
|
51
Moving onto the power box.My normal practice is to have these nickel plated so tearing this down is part of the standard
|
52
I have found the fuse holder and while it may work it is not in a serviceable position this way.I is also mission the on
|
53
Plated box and receptacle ready to swap.
|
54
Box is now properly wired with the correct fuse holder and thermal protections.
|
55
Box rebuild complete.
|
56
Moving to the coil assemblies.
|
57
The trough is a wreck,the boards are trashed etc.
|
58
Trough rebuilt.Polished up,new coil,new OEM boards the updated version with the grommets.The underplayfield trough was nic
|
59
Flippers rebuilt with correct parts and hardware as well as NOS coils.
|
60
All other coils were also rebuilt and polished etc.
|
61
|
62
Coils are done.Slowly getting this game in proper order.The numerous hacks and poor repairs are making it a bit more t
|
63
Back to the playfield.I have been working on sanding all the holes clean as well as the shooter lane in order to prep it fo
|
64
Playfield has made it to the paint shop :-)
|
65
Being prepped for the first clear application.
|
66
Prepped and ready for the first clear application.
|
67
|
68
Cleared for the first time.
|
69
Shooter lane as cleared.
|
70
|
71
|
72
After this sets a couple days I will sand it down level and rework the inserts and other issues.
|
73
New cabinet is ready to rework and prep for refinishing.
|
74
|
75
Head will be reworked prior to priming as well.
|
76
The pores will be eliminated as well as the grain.
|
77
The seams in are also going to be eliminated.
|
78
Face is filled with a carbon fiber filler.This does not shrink and crack like traditional fillers can.
|
79
Face is ready.
|
80
The back will also have the seams and nail holes eliminated.
|