162
Cabinet sheet and speaker will be installed later.
|
163
All interior metal was plated even the receptacle for the cord.
|
164
|
165
|
166
The hacked wiring was replaced.
|
167
Cabinet is done.
|
168
Moving onto the playfield.It will need to be t nutted first.
|
169
Through parts are installed.The black playfield rails are new.
|
170
The hanger brackets that were previously corroded and painted black have been replated.s
|
171
|
172
|
173
|
174
New jet bumper parts.The orange parts were swapped out for more correct looking amber.
On the left side there is one m
|
175
Underside is ready to rebuild.
|
176
All new targets will be installed.
|
177
|
178
All the coils are new,polished and rebuilt.The slings were upgraded with stronger links as well.
|
179
the targets that are daisy chained(hooked together with generic yellow wire) will be redone with color correct wiring.
|
180
New targets wired in and put on a plug.I went with a 3 pin plug so as not to confuse it with the other 2 pin plug alread
|
181
These targets will be neatly wired with color correct wiring as well.No need for a plug though.the new targets are already
|
182
New targets wired in.
|
183
Switch harness is rebuilt and in place.All switches were tested and many were replaced.
|
184
These sockets are normally wired with a daisy chain which is fine except for in this location they ten to get chaffed
|
185
All the loom holders have been polished and will be placed next.
|
186
The lamp harness is roughed in place.The trunk motor is installed and the aluminum opto interrupter has been used in plac
|
187
Lamp harness is fully installed/solder in.
|
188
all that is left now underside is the coil harness.I will solder that in tomorrow than start tightening up the wiring.
|
189
Playfield GI connector is toast.
|
190
GI connector rebuilt.
|
191
The daisy chain was eliminated in the GI area pictured and neatly redone with color correct wire(purple and purple/white
|
192
Plated resting brackets are in place.
|
193
|
194
|
195
Notice how well polished all the metal is.This is going from WELL below average/corroded to this level(better than NIB)
|
196
Playfield is now in the cabinet.
|
197
Apron was cleaned and polished up.
|
198
Correct and now brass plated ball fence is there now.
|
199
Going to rebuild the speaker panel next.
|
200
The black part will be refinished the plastic part will be washed and buffed.It will eliminate most of the lighter surface
|
201
Panel rebuilt.A light overspray pattern is done to help give a more uniform look. A new upgraded speaker set will be inst
|