81
Playfield is in th cabinet now.
|
82
|
83
I had the upper metal trim chromed to tie it in with the rest of the trim.
|
84
Powered up for testing.
|
89
|
90
Topper and dome are in place.
|
91
Playfields are finished."Missing" boulder installed.
|
92
Boulder shooter installed.
game is complete less a little detailing.
|