81 Head screened with the correct warning text.
82 Cabinet is prepped and ready to decal.
83 Decals are applied.
84
85 I will finish them out shortly and begin rebuild.
86 Edges are finished.
87
88
89 Rebuild will follow.
90 New rails are installed.
91 The head is back on the lower.
92 Playfield is sanded and ready to polish.
93 Playfield polished and ready to begin rebuild.
94 Rebuild begins.
95 Through parts installed.
96 Backboard in place.Lighting will be added later.
97 Underside rebuild begins.
98 Cracked targets will be replaced.
99 All roll over and sling switches are replaced.The switch harness is rebuilt and installed.
100 Rebuilt flippers are installed.
101
102 Underside rebuild and wiring are complete.
103
104 Will be ready to go back in the cabinet next.
105 All boards have been repaired and serviced.
106 Baords are installed.
107 Shaker motor installed.Cabinet rebuild is complete less the speaker.
108
109
110
111
112 DMD panel is being refinished and rebuilt.
113 New clear window installed.The blue protective film will be removed.
114 DMD panel rebuild complete.
115 Playfield is now in the cabinet and powered up for testing.
116
117
118 I will add the lighting to the backboard last since the ships have to go on first.All lamps and functions are 100% so I
119 Ships are refinished and will be ready to populate with the LED s etc after an overnight cure.
120 Ships are now rebuilt with the LED kit.