Login « Register « Sidebar
HEP Restoration Gallery » Past restorations » Attack From Mars RS(2011)
 
Page: 1 2
 

Attack From Mars RS(2011)

74 items
1
Game as it arrived.
This side is  not too  faded.
 
 

1
Game as it arrived.
This side is not too faded.

2
This side is a bit more faded.
 
 

2
This side is a bit more faded.

3
 
 

3

4
Wrong flipper bats etc.Ready to start teardown.
 
 

4
Wrong flipper bats etc.Ready to start teardown.

5
Teardown in process.
 
 

5
Teardown in process.

6
 
 

6

7
 
 

7

8
Playfield is stripped complete bottom.
 
 

8
Playfield is stripped complete bottom.

9
Stripped complete top.
 
 

9
Stripped complete top.

10
Will start gutting the cabinet  next.
 
 

10
Will start gutting the cabinet next.

11
 
 

11

12
Parts rack .Parts are being  cleaned,polished  and rebuilt now.
 
 

12
Parts rack .Parts are being cleaned,polished and rebuilt now.

13
I will get the  playfield   fixed and cleared first so it can  cure  while the rest takes place.
 
 

13
I will get the playfield fixed and cleared first so it can cure while the rest takes place.

14
Shooter lane is decent.A little  puddled but I will  sand it  out.
 
 

14
Shooter lane is decent.A little puddled but I will sand it out.

15
Inserts  need a little  leveling.
 
 

15
Inserts need a little leveling.

16
Missing a touch of art on the Jackpot  border.
 
 

16
Missing a touch of art on the Jackpot border.

17
Sanded.
 
 

17
Sanded.

18
Art corrections made.
 
 

18
Art corrections made.

19
Missing  detail added.Will look natural once cleared.
 
 

19
Missing detail added.Will look natural once cleared.

20
Ready to clear.
 
 

20
Ready to clear.

21
Cleared.
 
 

21
Cleared.

22
 
 

22

23
 
 

23

24
 
 

24

25
That should do it on the playfield until it is time  to sand and polish.
 
 

25
That should do it on the playfield until it is time to sand and polish.

26
Cabinet gutted.
 
 

26
Cabinet gutted.

27
Head gutted.
 
 

27
Head gutted.

28
Cabinet is being stripped.
 
 

28
Cabinet is being stripped.

29
Lower stripped repairs in process.
 
 

29
Lower stripped repairs in process.

30
Head stripped repairs in process.
 
 

30
Head stripped repairs in process.

31
First repairs are  sanded.
 
 

31
First repairs are sanded.

32
Second repairs are in the  works
 
 

32
Second repairs are in the works

33
Head seams are being addressed as well.
 
 

33
Head seams are being addressed as well.

34
Repairs complete ready to prime.
 
 

34
Repairs complete ready to prime.

35
 
 

35

36
Primed.
 
 

36
Primed.

37
 
 

37

38
Sanded and ready to base in black.
 
 

38
Sanded and ready to base in black.

39
 
 

39

40
Based in black ready to clear.
 
 

40
Based in black ready to clear.

 
Page: 1 2
 
Advanced Search
Powered by Gallery v2.3