41 Playfield cleared.
42
43 Highlighting the repaired area or added detail.
44
45 That should be all it takes.Once it cures I will sand and polish it but while I wait I will work on other aspects of
46 Playfield is sanded and ready to polish.
47 Playfield polished.
48
49
50 Plafield is ready for rebuild.
51 New lower cabinet .
52 New head.
53 Ready to start prepping these for refinishing.
54 Seams and nail holes are being eliminated.
55 Face is smoothed in.
56 Head is primed and guide coated.
57 Lower seams are eliminated.
58
59 Lower primed and guide coated.
60 Head sanded and is being prepped for final paint and clear.
61 Lower sanded and being prepped.
62 Lower based and trimmed out in black.
63 Lower cleared.Will gloss down as it cures.
64 Head based and cleared.
65 Head is screened.
66 Decals are applied.
67 Will finish the edges and begin the rebuild in the morning.
68 All boards were serviced.
69 Head rebuilt.
70 Head is fitted for the translite and speaker panel.
71 Head is set on lower.
72
73 Speaker panel will be refinished and rebuilt with a new window.
74 Speaker panel rebuilt.
75 Speaker panel is in place.
76 Cabinet is fully rebuilt,wired and up on legs.
77
78 All wiring is neatly routed.
79
80