81
|
82
Cabinet will go up on legs next and the playfield rebuild will begin.
|
83
Game is now on on legs and the cabinet portion is finished.
|
84
Mother ship bracket is welded.
|
85
Bracket will be replaced.
|
86
Ships were painted silver including the underside of the mother ship.
|
87
Mother ship is being rebuilt.New plate.
|
88
New board with green LEDs to match the saucers and domes.
|
89
Mother ship rebuilt.
|
90
Saucers are being done now.
|
91
Plafield rebuild in process.
|
92
|
93
Through parts(most of them) are installed.
|
94
All the coils were replaced.The hardware was nickle plated or polished as needed.
|
95
Underside rebuild begins.
|
96
All the coil brackets were polished as well as all the screws that hold it all together.
|
97
|
98
Playfield wiring is complete for now.
|
99
Resting brackets plated.
|
100
Motor and housing polished.New targets installed and rewired through protective tubing.
|
101
Speaker panel is cleaned and refinished.Will be rebuilt with new window,speakers and DMD.
|
102
Current DMD shows burn in.Will be used for testing.
|
103
Playfield is in the cabinet and powered up for testing.
|
104
Another day or two and it should be done.
|
105
Speaker panel is rebuilt with the upgraded speakers and a new dmd as well as the dmd window.
|
106
Martian coils were all put on plus.This will make it mach easier to add martian LED light kits in the future if you choose
|
107
Red star post lighting kits are added.A new access hole was drilled so the job will be neat and reliable.Running them throu
|
108
Star post controller board neatly mounted and wired.The star post are wired to both the mother ship flasher and the slin
|
109
Rear ramp is rebuilt and installed.New cow ramp is also installed.All now have stainless flaps and were shaped to give a go
|
110
Green squiggles were installed on the new plastic set.
|
111
|
112
One more ramp and wireform as well as some added lighting to add to the back board.Very close.
|
113
Playfield rebuild is complete.
|
114
|
115
|
116
All that is left is installing the light bar on the backboard and some detail work.
|
117
Translite will be restored next.
|
118
LEDs will be removed.
|
119
Glass is scratched up and will need to be replaced.
|
120
Panel is torn down.Shows a lot of burn/discoloration from the heat.
|