80a
Back to the power box.It has been plated as well as the receptacle.
|
80b
Box is now properly wired with the correct protections in place.
|
80c
Box is ready to go back into the cabinet.
|
80d
New Pinbits green mirror installed.
|
81
Cabinet is wired and rebuild of that is complete until the playfield goes back in.
|
82
|
83
|
84
|
85
Playfield is t nutted.
|
86
Ready for topside rebuild.
|
87
No more blank bar codes :-)
|
88
All coil assemblies polished and rebuilt.Some of the brackets were plated to eliminate the corrosion that was present.
|
89
Through parts installed.
|
90
|
91
Pops will be wired to flash when activated.
|
92
Ready to flip.
|
93
Underside is ready to rebuild now.
|
94
Jet bumpers are being wired for lighting/flashers.
|
95
Switch harness was rebuilt and installed.
|
96
I put red bulb covers on the KISS insert lights.Looks good when lit up.
|
97
Underside wiring is complete.Took a little bit of extra time removing daisy chains and neatening it all up.
|
98
Resting brackets were plated.
|
99
|
100
The previously butchered scoop was replaced.
|
101
|
102
The lighting mod for the jet bumpers was very neatly done in a factory style.
|
103
Playfield is in the cabinet now.
|
104
|
105
Almost there.Another day or so.I will get it powered up for testing next.
|
106
Powered up for testing.
|
107
|
108
|
109
Brake light mod looks good.I just went with straight 12v power no fancy effects because I like the look that all the cars
|
110
|
111
Apron looks to have been coated with something that makes it look too flat.
|
112
Better close up of the issue.I will clear it andf replace the faded universal monster decal in the center(not in the pictu
|
113
Apron is prepped and ready to clear.
|
114
Apron is cleared.
|
115
Apron is dry and installed.new decal in the center.
|
116
Plastics are in place as are most of the ramps etc.
|